INSTALLER
29
b
Always maintain a slope “i” of over 3° and ensure
that the diameter of any hose used is greater than
that of the boiler's own condensate drain pipe.
b
The connection to the waste water drain must be made
in compliance with national and local legislation and
standards.
b
Fill the siphon with water before you start up the boiler
to prevent products of combustion escaping into the
room during the first few minutes of boiler functioning.
b
Condensate from the boiler and from the flue
should be channelled to the same drain point.
b
The surface on which the boiler stands must be per-
fectly horizontal and flat over the entire area of the
boiler frame in order to avoid condensate drainage
problems.
b
Any condensate neutralisation units deemed neces-
sary may be connected downstream from the siphon.
Evaluate the neutralisation unit after one year of opera-
tion to estimate the duration of the neutralisation char-
ge. The total duration of the charge can be estimated
from the level after one year.
i
i
≥
3°
DRAINING THE CONDENSATE
BOILER
Drain
Flue
Condensate from stack
Condensate
from boiler
To drain or
neutralisation
unit if installed
Содержание TAU 150 UNIT
Страница 1: ...INSTALLATION AND MAINTENANCE MANUAL CONDENSING BOILERS TAU 150 210 UNIT...
Страница 70: ...TECHNICAL ASSISTANCE SERVICE 70...
Страница 71: ......