ENGLISH
25
ENTER TIME AND DATE
12
17
18/11/2013
:
TIME & DATE
-
setting the operating mode of the REC10:
MASTER
: select this option when the REC10 is also a MACHINE INTERFACE.
-
configuration selection:
MAIN PCB
: to reset the current boiler configuration on REC10 MASTER and finish the
operation
NEW
: to set a new system configuration restoring the factory setting of the parameters
NEW
MAIN PCB
SELECT THE TYPE OF
CONFIGURATION
-
Whenever a “NEW” configuration is selected, proceed as follows:
-
select REC10 functionality:
ON BOARD
: if the REC10 is used only as a system interface and not as an ambient
regulator
AMBIENT
: if the REC10 is used as a system interface and also as an ambient regulator
of the zone where it is installed
ON BOARD
WHERE IS THE REC10 INSTALLED?
AMBIENT
BOILER
-
select the type of boiler INSTANTANEOUS (the boiler is the combined variety)
INSTANTANEOUS
HW TANK
CH ONLY
SELECT THE PLANT CONFIGURATION
PLANT
-
select the type of domestic hot water request on the FLOW METER.
PLANT
FLOW METER
FLOW SWITCH
-
Once the guided procedure has finished, the REC10 will go to the initial screen.
Continue with the configuration as follows:
-
access the technical parameters as explained in the section“ Accessing the technical
parameters” entering the SERVICE password
-
select PARAMETERS with the “
UP
” and “
DOWN
” keys, confirming the selection
-
next change the following parameters:
ENABLE FILLING: set to 1.
Then proceed with the reprogramming of the boiler, carrying out the operations described
in the section “Programming the boiler”.
5.21 Replacing the REC10 Master
b
The system configuration operations need to be carried out by professionally
qualified personnel of the Technical Assistance Centre.
When replacing the REC10 MASTER, at the subsequent restart it displays an initial screen
with the firmware revision. Pressing “
ENTER
” starts a guided procedure for configuring the
system, see the section “Configuring the system”.
Follow the procedure and carry out the
MAIN PCB
type of configuration
.
PRESS ANY KEY TO CONTINUE
REC10R
R02.06
Welcome home
NEW
MAIN PCB
SELECT THE TYPE OF
CONFIGURATION
5.22 Replacing the MAIN PCB board
The system configuration operations need to be carried out by professionally qualified
personnel of the Technical Assistance Centre.
The systems continually carries out a consistency control between the configuration data
saved on the MAIN PCB
electronic board and that saved in the REC; therefore, when replacing
the MAIN PCB
electronic board, it might happen that the system detects an inconsistency
between the data saved on the MAIN PCB
and that in the REC. In this case, the latter will ask
the user which of the two configurations is to be considered valid; selecting to recuperate the
configuration from the REC itself it is possible to avoid reconfiguring the machine:
-
select REC10 with the “
UP
” and “
DOWN
” keys, confirming the selection
.
MAIN PCB
REC10
SELECT THE TYPE OF
CONFIGURATION
5.23 Combustion Control Parameters
Even if the parameters regarding the new ACC combustion control system (active
combustion control) are preset in the factory, it might be necessary to programme them,
this is in the case where both electronic boards (MAIN PCB and REC10 MASTER) need
to be replaced at the same time. Access the technical parameters as explained in the
section“ Accessing the technical parameters” entering the SERVICE password. Select
COMBUSTION MONITORING with the “
UP
” and “
DOWN
” keys, confirming the selection.
ERROR HISTORY
EXHAUST PROBE RESET
AIR PURGING CYCLE
PARAMETERS
COMBUSTION MONITORING
SERVICE
TECHNICAL
-
Select
GAS TYPE
.
-
Set this parameter based on the type of gas the boiler is using. The values for this
parameter are MTN = METHANE - GPL = LPG
BOILER TYPE
COMBUSTION OFFSET
GAS TYPE
SERVICE
COMBUSTION MONITORING
-
Select
BOILER TYPE
-
Set this parameter based on the type of boiler as shown in the table