Electrical Installation
Operating instructions RLD 97
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
Terminal usage:
Figure 4.4.4.2
Note!
The terminals 5,6,9 and 10 are not lead through.
1
2
3
4
5
6
7
8
9
10
11
12
+
-
External
OFF
Not
used
ON/RESET
Terminal 5 and 6 intern connected
to the temperature supervision
X2
Common fault
relay
Содержание RLD B
Страница 68: ...Installation Operating instructions RLD 67 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 1 Enclosure 0 340...
Страница 69: ...Installation 68 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 1 500...
Страница 70: ...Installation Operating instructions RLD 69 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 2 700...
Страница 71: ...Installation 70 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 3 800...
Страница 72: ...Installation Operating instructions RLD 71 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 3 801...
Страница 73: ...Installation 72 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 3 802...