Installation
Operating instructions RLD 61
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
4
Installation
4.1
Mechanical installation
4.1.1
Important hints
•
Use the power feedback units as build-in devices only!
•
Observe free spaces!
-
Several power feedback units in one cabinet may be installed next to each other
without spacing.
-
Keep a horizontal distance of at least 70mm to other components and to the cabinet
walls.
-
Keep a vertical distance of at least 150mm to other components and to the cabinet
walls.
•
Ensure that there are no obstacles in the way of the cooling air input and output.
•
If the cooling air is polluted (dust, dirt swirl, grease, aggressive gas ) so that the func-
tion of the power feedback unit may be impeded
-
Take sufficient countermeasures, e.g. separate cooling air, mounting of air filters,
periodical cleaning.
•
Do not exceed the ambient temperature permissible during operation.
Provided mounting position
The power feedback unit has been designed for vertical wall mounting (
±
15
°
) only.
Mounting is allowed only on a flat surface without using any kind of spacers. This kind of
mounting is necessary to guarantee the right way for the cooling air. A power loss of 3 %
from the maximum nominal power rating has to be calculated. Air-temperature may not
exceed 40 °C near the unit. Air-in- and air-out-openings at the top and the bottom of the
unit may not be concealed by installation materials such as cable ducts or other equipment.
Keep a distance of min. 15 cm to the air-in- and air-out-openings and a distance of min. 7
cm to beside mounted parts or cabinet-walls.
Содержание RLD B
Страница 68: ...Installation Operating instructions RLD 67 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 1 Enclosure 0 340...
Страница 69: ...Installation 68 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 1 500...
Страница 70: ...Installation Operating instructions RLD 69 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 2 700...
Страница 71: ...Installation 70 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 3 800...
Страница 72: ...Installation Operating instructions RLD 71 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 3 801...
Страница 73: ...Installation 72 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 3 802...