Commissioning
Operating instructions RLD 107
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
5
Commissioning
Danger!
Prior to initial switch-on of the power feedback unit check the wiring for completeness, short-
circuit and earth fault.
Danger!
If the wiring is not correct, a non-intended operation of controller and/or power feedback unit is
possible.
5.1
First powering up
1.
Switch on mains supply :
- The power feedback unit is ready for operation after ca. 1s
2.
Check the readiness for service of the power feedback unit:
– If only the green LED is on:
Power feedback unit is ready for service.
– If beside the green LED also other LED’s are on:
A disturbance is present. Before proceeding with commissioning, remove the distur-
bance (refer to chapter 7 "Troubleshooting”).
3.
Check the readiness for service of the controller:
– Proceed in accordance with the controller manual.
Содержание RLD B
Страница 68: ...Installation Operating instructions RLD 67 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 1 Enclosure 0 340...
Страница 69: ...Installation 68 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 1 500...
Страница 70: ...Installation Operating instructions RLD 69 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 2 700...
Страница 71: ...Installation 70 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 3 800...
Страница 72: ...Installation Operating instructions RLD 71 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 3 801...
Страница 73: ...Installation 72 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 3 802...