Electrical Installation
Operating instructions RLD 93
ELTROPLAN
-
REVCON
Elektrotechnische Anlagen GmbH
Danger!
At this configuration the input current of the frequency converter must not exceed the nominal
current of the RHF-RA!
At non observance damages at the RHF-RA and / or the frequency converter cannot be excluded!
Legend for figure 4.4.1.4 (REVCON
RLD B0/D0 and FC with RHF-RA
)
1.
Fusing in accordance with controller manual.
2.
It is not allowed to connect any other devices except the frequency inverter and the
power feedback unit behind the main magnetic switch.
Danger!
If this is not observed, you take the risk that, in the case of switching off the mains during feed-
back the power, the voltage in that sector may rise up to a dangerous level. This may destroy the
connected devices and perhaps also the inverter and / or the power feedback unit. To avoid such
a situation, the power feedback unit is equipped with an overvoltage switch off, but nevertheless
this hint should be observed!
3.
RHF-RA module
4.
Fusing in accordance with power feedback unit manual. This may be left out, if at posi-
tion 1 semiconductor fuses or full range fuses are used and if after 1 the cross section of
the wires is not reduced.
5.
RFI-filter (optional):
At RFI-filter up to and including installation size RFI-RA23 is the connection to the
power feedback module realized by a PG-screw connection. This connection of the RFI-
filter must occur phase correct over the terminals -From Supply-. The terminals -To In-
verter- must be open.
6.
Cross section in accordance with the relevant VDE-rules.
7.
(Supply, <2A current input) in accordance with DIN VDE 0298 or short circuit proof
wiring.
8.
At these terminals one or more controllers (even with different power ratings) may be
attached, like it shown in figure 4.5.1. Even if several controllers are attached, the wires
have to be as
short and low impedance
as possible!
Содержание RLD B
Страница 68: ...Installation Operating instructions RLD 67 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 1 Enclosure 0 340...
Страница 69: ...Installation 68 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 2 Enclosure 1 500...
Страница 70: ...Installation Operating instructions RLD 69 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 3 Enclosure 2 700...
Страница 71: ...Installation 70 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 4 Enclosure 3 800...
Страница 72: ...Installation Operating instructions RLD 71 ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 5 Enclosure 3 801...
Страница 73: ...Installation 72 Operating instructions RLD ELTROPLAN REVCON Elektrotechnische Anlagen GmbH 6 Enclosure 3 802...