Start the Controller
Startup is a two-part procedure
that is performed in the following
sequence:
1.
Running the drive in the
Speed Regulation mode with
the motor uncoupled from the
machine or load.
2.
Running the drive in the
selected regulation mode with
the motor coupled to the
machine or load.
Note:
Should the controller IET,
press the Reset pushbutton (4SW)
on the front of the controller to
reset all faults.
Perform Startup Procedure 1
with Motor Uncoupled
CAUTION
Do not perform Procedure 2
before Procedure 1. Failure to
observe this precaution could
result in damage to, or de-
struction of, the equipment.
WARNING
THIS DRIVE IS CAPABLE OF
OPERATING AT AND MAIN-
TAINING ZERO SPEED. THE
USER IS RESPONSIBLE FOR
ASSURING SAFE CONDI-
TIONS FOR OPERATING
PERSONNEL BY PROVID-
ING SUITABLE GUARDS
AND AUDIBLE OR VISUAL
ALARMS OR OTHER DE-
VICES TO INDICATE THAT
THE DRIVE IS OPERATING
OR MAY BE OPERATING AT
OR NEAR ZERO SPEED.
FAILURE TO OBSERVE
THESE PRECAUTIONS
COULD RESULT IN BODILY
INJURY.
1.
Follow all of the “Check the
Installation” procedures if not
already performed.
2.
Make sure all power is OFF.
The D-C bus capacitors
remain charged for at least
one minute after power is
removed. Do not work on the
controller unless the
capacitors are fully
discharged. The POWER LED
should not be illuminated at
this time.
DANGER
THIS EQUIPMENT IS AT LINE
VOLTAGE WHEN A-C POW-
ER IS CONNECTED TO THE
CONTROLLER. WHENEVER
POWER IS REMOVED,
VERIFY WITH A VOLTMETER
AT FACEPLATE TERMINAL
147(+) AND 145(–) THAT THE
D-C BUS CAPACITORS ARE
DISCHARGED BEFORE
TOUCHING ANY INTERNAL
PARTS OF THE CONTROL-
LER. FAILURE TO OBSERVE
THIS PRECAUTION COULD
RESULT IN SEVERE BODILY
INJURY OR LOSS OF LIFE.
3.
Connect a voltmeter to
faceplate terminal 147(+) and
regulator board terminal
145(–) (see Figure 7-11).
Read this voltmeter every time
you turn power OFF to verify
the D-C bus is fully
discharged. See Step 2
regarding the D-C bus
discharge.
4.
Uncouple the motor from the
machine or load.
5.
Set regulator switches 1SW
and 2SW as shown in Figure
4-6.
6.
Verify that the pots are set
according to “Review the
Regulator Pots.” See Figure
4-6.