│
12
• insert nuts into both the rails. Put the retaining side brackets on the rails and
fi
x the collector using M8x18
bolts.
• lay the following collector next to the
fi
rst one, maintaining a suf
fi
cient gap. Then put on the threaded
fi
ttings
and push the collector to the already mounted one until stop. Hold the
fi
tting with a spanner to prevent turning
and tighten the nuts. More on this in chapter
5 Hydraulic Connection (see page 18)
.
• continue mounting further collectors in the same way.
3
Connection Pipe Passage through a Roof
For passing the connection pipes through a roof e.g. ventilation tiles can be used, where the hole is modi
fi
ed
according to the diameter of the pipe with insulation. However, any preferred method must comply with the
standards of the roo
fi
ng manufacturer.
Pic. 13: Distance between the safety retaining brackets
05 – M8 nut for rails
08 – M8x18 allen head bolt
09 – Retaining bracket
Pic. 14: Fixing the retaining brackets
~100 mm
B
14
~100 mm
~800 mm
Содержание KPC1-BP
Страница 1: ...Installation and Operation Manual for a Solar System with KPC1 BP Collectors EN v 1 3...
Страница 25: ...25...