23
│
10 System Filling, Flushing, Leak Test and Air Bleeding
The below listed procedures are valid when a Regulus pump station is used.
10.1 Filling
• in order to
fi
ll the system, use a
fi
lling device with a reservoir for solar liquid and a
fi
lling pump (see pic. 32)
• attach the
fi
lling hose to the feed valve and open the valve completely
• attach the return hose to the bleed valve and open the valve completely
• close the integrated ball valve in the
fl
owmeter (the groove in the
fl
owmeter‘s adjusting screw must be horizontal).
Open the check valve above the pump by turning the ball valve by 45° (intermediate position between opening
and closing)
• turn on the
fi
lling pump and pour suf
fi
cient quantity of solar
fl
uid into the reservoir of the
fi
lling device and
fi
ll the
solar system
10.2 Flushing
•
fl
ush the solar system for at least 15 minutes using the
fi
lling device. In order to bleed air from the system
perfectly, open shortly the integrated ball valve of the
fl
owmeter from time to time (the groove vertically).
Pic. 32: Filling a solar system
Содержание KPC1-BP
Страница 1: ...Installation and Operation Manual for a Solar System with KPC1 BP Collectors EN v 1 3...
Страница 25: ...25...