UMHPI
Industrial inverter air/water heat pumps with axial fans
28
3) After r15 minutes later,
DHW
auxiliary electric heater
9
1)
DHW auxiliary electric heater
2) After r15 minutes,
heat pump
HEAT /
HEAT+SAN
In HEAT OR in
SAN
1 1
Set up of
minutes
Set up of
minutes
3/6 0
10
1)
Boiler
2) After r12 minutes,
heat pump
HEAT /
HEAT+SAN
In HEAT OR in
SAN
1 1
Set up of
minutes
Set up of
minutes
3 3
11
ORDER OF INTERVENTION OF
HEATING EQUIPMENTS
(when the
setpoint is not achieved)
HEAT /
HEAT+SAN
In HEAT OR in
SAN
1 1
Set up of
minutes
Set up of
minutes
6 3
12
1)
Boiler
2) After r12 minutes,
heat pump
HEAT /
HEAT+SAN
In HEAT OR in
SAN
1 1
Set up of
minutes
Set up of
minutes
0 3
TABLE 4. SUBSTITUTION OPERATION
N°
ORDER OF INTERVENTION OF HEATING
SYSTEMS
(when the setpoint is not achieved)
MODE
OPERATION
r10
r15
r12
r16
r23
r24
1
1)
Boiler
2) After r12 minutes,
auxiliary E-heater of
plant
HEAT /
HEAT+SAN
HEAT 0/1
0/1/2
Set up of
minutes
/ 4/6
1/3
2
1)
Auxiliary plant E-heater
2) After r12 minutes,
boiler
HEAT /
HEAT+SAN
HEAT 0/1
0/1/2
Set up of
minutes
/ 1/3
1/3
3
1)
Boiler
2) After r12 minutes,
DHW auxiliary electric
heater
HEAT+SAN SAN 0/1
0/1/2
/
Set up of
minutes
5/6 2/3
4
1)
DHW
Auxiliary heater
2) After r12 minutes,
boiler
HEAT+SAN SAN 0/1
0/1/2
/
Set up of
minutes
2/3 2/3
5
1)
Boiler
2) After r12 minutes,
Auxiliary
electric
heater of plant/DHW
HEAT /
HEAT+SAN
In HEAT OR in SAN
0/1
0/1/2
Set up of
minutes
Set up of
minutes
6 3
6
1)
Auxiliary electric heater of plant/DHW
2) After r12 minutes,
boiler
HEAT /
HEAT+SAN
In HEAT OR in SAN
0/1
0/1/2
Set up of
minutes
Set up of
minutes
3 3
7
1)
Boiler
HEAT /
HEAT+SAN
HEAT 0/1
0/1/2
Set up of
minutes
/ 1/3/4/6
0/2
8
1)
Auxiliary electric heater of plant
HEAT /
HEAT+SAN
HEAT 0/1
0/1/2
Set up of
minutes
/ 0/2/5
1/3
9
1)
Boiler
HEAT+SAN SAN 0/1
0/1/2
/
Set up of
minutes
2/3/5/6 0/1
10 1)
DHW electric heater
HEAT+SAN SAN 0/1
0/1/2
/
Set up of
minutes
0/1/4 2/3
11 1)
Boiler
HEAT /
HEAT+SAN
In HEAT OR in SAN
0/1
0/1/2
Set up of
minutes
Set up of
minutes
3/6 0
12 1)
Plant/DHW Auxiliary electric heater
HEAT /
HEAT+SAN
In HEAT OR in SAN
0/1
0/1/2
Set up of
minutes
Set up of
minutes
0 3
The below Table (5) shows the parameter to be set in order to enable the auxiliary electric heaters in "Summer and DHW" mode
(in this case, the only active auxiliary electric heater is the one of DHW side and the subdivision between normal/joint/substitution
operation is not valid).
TABLE 5. (C DHW PRODUCTION OPERATION MODE)
N°
ORDER OF INTERVENTION OF AUXILIARY
ELECTRIC HEATERS
- when the set point is not achieved after
r16 minutes from the compressor start-up
or
- when the setpoint is not achieved and
the unit is in alarm condition.
MODE
OPERATION
r10
r15
r12
r16
r23
r24
1
1)
DHW
auxiliary
electric heater
COOL+SAN SAN 0/1
1
/
Set up of
minutes
0/1/2/
3/4/5/
6
2/3
Содержание UMHPI
Страница 1: ...Chiller and Heat Pumps UMHPI Controller USER MANUAL UMHPI on board electronic user controller ...
Страница 2: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...FAE0FA000BZ 00 06 2018 bit ly rdzwebsite ...