UMHPI
Industrial inverter air/water heat pumps with axial fans
27
TABLE 2. JOINT OPERATION “AREA 1”
N°
ORDER OF INTERVENTION OF
HEATING EQUIPMENTS
(when the
setpoint is not achieved)
MODE
OPERATION
r10
r15
r12
r16
r23
r24
1
1)
Heat pump
2) After r12 minutes,
plant auxiliary
electric heater
HEAT /
HEAT+ SAN
HEAT 1
0/1/2
Set up of
minutes
/ 0/2/5
1/3
2
1)
Heat pump
2) After r12 minutes,
boiler
HEAT /
HEAT+SAN
HEAT 0/1
0/1/2
Set up of
minutes
/ 1/3/4/6
0/2
3
1)
Heat pump
2) After r12 minutes,
plant auxiliary
electric heater
3) After r12 minutes later,
boiler
HEAT /
HEAT+SAN
HEAT 1
0/1/2
Set up of
minutes
/ 1/3
1/3
4
1)
Pompa di calore
2) After r12 minutes,
boiler
3) After r12 minutes later,
plant
auxiliary electric heater
HEAT /
HEAT+ SAN
HEAT 1
0/1/2
Set up of
minutes
/ 4/6
1/3
5
1)
Heat pump
2) After r16 minutes,
DHW E- heater
HEAT+SAN SAN
0/1
1
/
Set up of
minutes
0/1/4 2/3
6
1)
Heat pump
2) After r16 minutes,
boiler
HEAT+SAN SAN
0/1
0/1/2
/
Set up of
minutes
2/3/5/6 0/1
7
1)
Heat pump
2) After r16 minutes,
DHW E- heater
3) After r16 minutes later,
boiler
HEAT+SAN SAN
0/1
1
/
Set up of
minutes
2/3 2/3
8
1)
Heat pump
2) After r16 minutes,
boiler
3) After r16 minutes later,
DHW
auxiliary electric heater
HEAT+SAN SAN
0/1
1
/
Set up of
minutes
5/6 2/3
9
1)
Heat pump
2) After r12 minutes,
Plant/DHW
auxiliary electric heater
HEAT /
HEAT+ SAN
In HEAT OR in SAN
1
1
Set up of
minutes
Set up of
minutes
0 3
10
1)
Heat pump
2) After r12 minutes,
boiler
HEAT /
HEAT+SAN
In HEAT OR in SAN
0/1
0/1/2
Set up of
minutes
Set up of
minutes
3/6 0
11
1)
Heat pump
2) After r12 minutes,
Plant/DHW
auxiliary electric heater
3) After r12 minutes later,
boiler
HEAT /
HEAT+SAN
In HEAT OR in SAN
1
1
Set up of
minutes
Set up of
minutes
3 3
12
1)
Heat pump
2) After r12 minutes,
boiler
3) After r12 minutes later,
Plant/DHW
auxiliary electric heater
HEAT /
HEAT+SAN
In HEAT OR in SAN
1
1
Set up of
minutes
Set up of
minutes
6 3
TABLE 3. JOINT OPERAZIONI ”AREA 2”
N°
ORDER OF INTERVENTION
(When the setpoint is not fulfilled)
MODE
OPERATION
r10
r15
r12
r16
r23
r24
1
ORDER OF INTERVENTION OF
HEATING EQUIPMENTS
(when the
setpoint is not achieved)
HEAT /
HEAT+SAN
HEAT 0/1
0/1/
2
Set up of
minutes
/ 1/3/4/6 0/2
2
1)
Boiler
2) After r12 minutes,
heat pump
HEAT /
HEAT+SAN
HEAT 1
0/1/
2
Set up of
minutes
/ 1/3 1/3
3
1)
Boiler
2) After r12 minutes,
auxiliary electric
heater of plant
3) After r12 minutes later,
heat pump
HEAT /
HEAT+SAN
HEAT 1
0/1/
2
Set up of
minutes
/ 4/6 1/3
4
1)
Boiler
2) After r12 minutes,
heat pump
3) After r12 minutes later,
auxiliary
electric heater of plant
HEAT /
HEAT+SAN
HEAT 1
0/1/
2
Set up of
minutes
/ 0/2/5 1/3
5
1)
Auxiliary electric heater of plant
2) After r12 minutes,
heat pump
HEAT+SAN SAN 0/1
0/1/
2
/
Set up of
minutes
2/3/5/6 0/1
6
1)
Boiler
2) After r15 minutes,
heat pump
HEAT+SAN SAN 0/1
1 /
Set up of
minutes
2/3 2/3
7
1)
Boiler
2) After r15 minutes,
DHW auxiliary
electric heater
3) After r15 minutes later,
heat pump
HEAT+SAN SAN 0/1
1 /
Set up of
minutes
5/6 2/3
8
1)
Boiler
2) After r15 minutes,
heat pump
HEAT+SAN SAN 0/1
1 /
Set up of
minutes
0/1/4 2/3
Содержание UMHPI
Страница 1: ...Chiller and Heat Pumps UMHPI Controller USER MANUAL UMHPI on board electronic user controller ...
Страница 2: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...FAE0FA000BZ 00 06 2018 bit ly rdzwebsite ...