Raisecom
ISCOM2600G-HI (A) Series Configuration Guide
9 OAM
Raisecom Proprietary and Confidential
Copyright © Raisecom Technology Co., Ltd.
392
9.4.12 Example for configuring SLA
Networking requirements
As shown in Figure 9-6, SLA is deployed on the Switch, and is periodically scheduled to test
the network performance between Switch A and Switch C.
Figure 9-6
SLA test networking
Configuration steps
Step 1
Configure CFM on the Switch.
For details, see section 9.3.13 Example for configuring CFM.
Step 2
Configure y1731-pkt-loss operation on Switch C, and enable operation scheduling.
Switch_C#config
Switch_C(config)#sla 2 y1731 pkt-loss remote-mac 000e.5e00.0001 level 3
svlan 3
Switch_C(config)#sla schedule 2 life 20 period 10
Checking results
Use the
show sla configuration
command on Switch C to show SLA configurations.
Raisecom#show sla 2 configuration
------------------------------------------------------------------------
Operation <2>:
Type: ETH-Y1731-PKT-LOSS
Frame Type: SLM
Schedule Starttime: 0 days, 00:00:00
------------------------------------------------------------------------
CoS: 7