
11-2
1.
1.
1.
1. General Overview
General Overview
General Overview
General Overview---- Servicing the Raider Outboard
Servicing the Raider Outboard
Servicing the Raider Outboard
Servicing the Raider Outboard
The most critical step in maintaining longevity of outboard motors is the break in period. Proper break in when first
acquired and installed on the RIB is paramount to a long, successful militarized Raider outboard. Each Raider outboard is
started and tested prior to delivery, however, the break in has not been completed. It is vital proper break in be completed
on the new and rebuilt Raider. This section is important to successfully accomplish the break in for the Raider.
⑩⑩⑩⑩
2.
2.
2.
2.Test
Test
Test
Test RunTank
RunTank
RunTank
RunTank andTest
andTest
andTest
andTest Propeller
Propeller
Propeller
Propeller
•
Test Run Tank Requirements and Precautions For Use
(1) Partition (required when testing two engines in one tank)
(2)Ventilation duct
(3)Water level
(4)Transom board
•
The figure to the right shows the minimum dimensions required for the test run tank.
•
The dimensions shown in the figure are the minimum that must be provided for a single engine,whether it be in a tank
partitioned for two engines.
•
Test Propeller
Out to diameter:198 mm
Out width:20 mm
Blade width:40 mm
Precautions for operation
•
Continuous operation will raise the temperature of water in the tank,potentially causing the engine to seize up
.
,so
it is important to maintain water temperature in the 25
③
C(7JOF) range. It is also recommended that cooling and
over flow systems be installed.
•
Over periods of continued use,the tank water gradually becomes contaminated by the waste discharged from
the engine.This waste,which eventually coats the interior of the engine's cooling system,will reduce the engine's
cooling capability,so it is important to change tank water on a regular basis.
•
Over periods of continued use,engine exhaust fumes will accumulate near the engine.
Engineperformanceisaffectedastheenginetakesinairwithincreasinglevels of these gases from the throttle body,
so it is important to install mechanical ventilation system to maintain an exhaust gas
-
free environment around
the engine.
•
The water in the tank will tend to splash and spray out unless a sufficiently high of water is maintained in the
tank.
Содержание 40 hp
Страница 3: ......
Страница 9: ...1 2 2 O 2 O 2 O 2 Outline Dimensions utline Dimensions utline Dimensions utline Dimensions ...
Страница 17: ...1 10 ...
Страница 19: ...2 2 ...
Страница 20: ...2 1 ...
Страница 35: ...2 16 5 Special Tools 5 Special Tools 5 Special Tools 5 Special Tools ...
Страница 43: ...2 24 ...
Страница 48: ...3 5 ...
Страница 50: ...3 7 ...
Страница 54: ...3 11 ...
Страница 57: ...4 2 1 1 1 1 Power Uni Power Uni Power Uni Power Unit t t t ...
Страница 60: ...4 5 ...
Страница 66: ...4 11 ...
Страница 68: ...4 13 ...
Страница 72: ...4 17 ...
Страница 75: ...4 20 ...
Страница 86: ...4 31 ...
Страница 97: ...4 42 Piston and Crankshaft Piston and Crankshaft Piston and Crankshaft Piston and Crankshaft ...
Страница 106: ...4 51 ...
Страница 111: ...5 2 1 1 1 1 Wire Routing Wire Routing Wire Routing Wire Routing ...
Страница 112: ...5 3 ...
Страница 113: ...5 4 ...
Страница 114: ...5 5 ...
Страница 115: ...5 6 ...
Страница 116: ...5 7 Wiring Diagram 40B 50B EPTO ...
Страница 117: ...5 8 ...
Страница 118: ...5 9 ...
Страница 119: ...5 10 ...
Страница 120: ...5 11 ...
Страница 121: ...5 12 ...
Страница 126: ...5 17 Note Slash shows stripe color of cable 2 2 2 2 Assembly Assembly Assembly Assembly ...
Страница 127: ...5 18 Wiring around solenoid Bracket ...
Страница 128: ...5 19 ...
Страница 129: ...5 20 ...
Страница 130: ...5 21 ...
Страница 136: ...5 27 Kill Switch Crank Sensor Oil Level Sensor Grounds Air Injector 1 ...
Страница 137: ...5 28 Air Injector 2 Air Injector 3 Coil 1 Coil 2 Coil 3 ...
Страница 138: ...5 29 Fuel Pump Fuse Box Regulator Stator Complete Wiring harness ...
Страница 140: ...6 2 1 1 1 1 Configuration Configuration Configuration Configuration GEARCASE DRIVESHAFT ...
Страница 141: ...6 3 GEARCASE PROPELLERSHAFT ...
Страница 152: ...6 14 ...
Страница 153: ...6 15 ...
Страница 185: ...10 20 ...
Страница 193: ...11 8 ...