21
GB
Installation sequence
1. / 2. / 3. ...
IMPORTANT
It is essential that the installation sequence is followed
It is essential that the installation sequence shown here and described in the following section is
complied with. Deviation from this or changes to some settings would require the system to be
reinstalled.
1.
Before assembly check the weight of the sliding unit (max. 80 kg).
2.
Assemble and connect the drive.
3.
Menu , activate a manual transmitter (optional)
4.
Menu , activate the search run for the end points.
5.
Check the running direction (1
st
run = opening).
6.
If necessary, menu , reverse running direction and repeat the search run.
7.
Connect the required operating units (sensor, motion detector etc.).
8.
Menu / , set the control inputs.
9.
Menu - activate further manual transmitters (optional)
or
Menu , activate a radio motion detector.
10.
Menu , set an automatic closing time (optional).