EZ2 Connect MDx User Manual 05/2022
129
Each run report is saved in two formats: PDF and XML. Both formats include the same information,
that is:
The user ID that was logged in when the run was started
The serial number of the instrument
The duration of the run
The time and date when the run was started and when it ended
Protocol information:
o
Name
o
Version
o
Application
o
Parameters selected
o
Number of samples
The kit name, material number, lot number, and expiration date
The title of the run report file, which includes the date when the run ended and the serial
number of the instrument
The status of the run, which indicates if the run was completed successfully, if it failed, or if it
was aborted
Errors (if occurred)
The status of the cleanup procedure that is required after a run ends
Information about the samples: their positions, names and any notes that were added by the
user
Information on sample flags
Maintenance information (due, executed, etc.)
Validity status of samples
5.10
Setting up the worktable
Setting up the EZ2 worktable consists of removing the tip rack and the cartridge rack from the
instrument, loading the cartridges, tubes, tip holders and tips, and placing the racks back into the
instrument. Some protocols require additional actions to be done before the start of a run, e.g.,
inversion of the cartridge to mix the magnetic beads. These actions are described in the Loading
the cartridge rack and Loading the tip rack screens of the protocol run setup process, and in the kit
handbooks.