A---17
Powerware BPIV Parallel Cabinet Installation and Operation
164201409 REV. B
101503
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
A
ONELINE DRAWINGS OF PARALLEL SYSTEM
1 of 3
061502
15 kVA and 30 kVA PARALLEL CABINET
(1+1 and 2+0 Configurations)
164201409---5
A
B
C
E9--E12
AC INPUT TO
MODULE #1
3 PHASE,
3 WIRE
AC INPUT
TO SYSTEM
BYPASS
3 PHASE,
4 WIRE
UPM 1
SWITCH
UPM 2
SWITCH
PARALLEL
CABINET
E1--E3, E12
BYPASS
C
ONTACTOR
K4
E1--E3, E12
FROM BYPASS
SOURCE
3 PHASE,
4 WIRE
BATTERY
DC---DC
INVERTER
CONVERTER
INPUT
CIRCUIT
BREAKER
CB1
INPUT
FILTER
RECTIFIER
SWITCHES
OUTPUT
FILTER
FUSE
OUTPUT
CONTACTOR
(K3)
CB2
UPM 1
STATIC
SWITCH
BYPASS
INPUT TO
MODULE #1
3 PHASE,
4 WIRE
UPS OUTPUT TO
CRITICAL LOAD
FUSE
K5
AC INPUT TO
MODULE #2
3 PHASE,
3 WIRE
BATTERY
DC---DC
INVERTER
CONVERTER
INPUT
CIRCUIT
BREAKER
CB1
INPUT
FILTER
RECTIFIER
SWITCHES
OUTPUT
FILTER
FUSE
OUTPUT
CONTACTOR
(K3)
CB2
UPM 2
STATIC
SWITCH
BYPASS
INPUT TO
MODULE #2
3 PHASE,
4 WIRE
FUSE
K5
AC OUTPUT TO PARALLEL
CABINET, 3 PHASE, 4 WIRE
AC OUTPUT TO PARALLEL
CABINET, 3 PHASE, 4 WIRE
NOTE: 1. UPM bypass and Parallel Cabinet
bypass input feeds must come from
the same source.
2. A bypass neutral feeder must be
supplied.
A
OPTIONAL
*
*
*
E6--8, E12
CB1
TB2
TB3
CB1
TB2
TB3
Содержание BPIV 15 kVA
Страница 1: ...Parallel Cabinet 15 kVA and 30 kVA BPIV INSTALLATION OPERATION MANUAL...
Страница 2: ......
Страница 3: ...www powerware com BPIV INSTALLATION OPERATION MANUAL Parallel Cabinet 15 kVA and 30 kVA...
Страница 15: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section I Installation...
Страница 31: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section II Operation...
Страница 102: ...W 2 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 This Page Intentionally Left Blank...
Страница 103: ......
Страница 104: ...164201409 Rev B 164201409B...