Powerware BPIV Parallel Cabinet Installation and Operation
164201409 REV. B
101503
8.
Remove three bolts, (2) in Figure 2---1, securing front shipping bracket to the
cabinet.
9.
If installing cabinet permanently, retain shipping brackets and hardware;
otherwise, discard or recycle the pallet and brackets in a responsible manner.
10.
Roll cabinet to final installation location.
11.
If permanently mounting the system, proceed to step 13; otherwise, proceed to
step 12.
12.
Secure the UPS cabinet in position by lowering the leveling feet, until cabinet is
not resting on the casters and the cabinet is level.
13.
Using retained hardware, reinstall shipping brackets previously removed to
front and rear of UPS cabinet with the angle facing outward.(see Figures 2---1
and 2---2).
14.
Secure cabinet to floor with contractor supplied hardware and proceed to
paragraph 2.3.2.
2.3.2
Installing Parallel Cabinet External Power Wiring
1.
Remove front vented panel from the Powerware BPIV Parallel Cabinet. Front
panel is secured with magnetic latches and is removed by pulling panel
straight forward to disengage magnetic latches (see Figure 2---1).
2.
If side access is available, proceed to step 6; otherwise, proceed to step 3.
3.
Remove top panel from Parallel Cabinet to gain access to UPM input terminals.
Retain hardware.
4.
Remove screws securing bottom internal safety shield panel. Remove panel to
gain access to bypass input and critical load output terminals. Retain
hardware.
5.
Proceed to step 7.
6.
Remove right and left side panels from Parallel Cabinet to gain access to input
and output terminals. Retain hardware.
7.
Remove input and output conduit landing plates from the Parallel Cabinet. Drill
or punch conduit holes for power wiring.
8.
Reinstall input and output conduit landing plates.
9.
Install conduit.
10.
Route UPM input power cables to Parallel Cabinet terminal blocks. Refer to
Appendix A of this manual for wiring access information.
NOTE:
UPM disconnect switches must be wired in order starting with UPM 1 (e.g.,
UPM 1 wired to UPM disconnect switch 1).
11.
Connect phase A, B, C, and Neutral input power wiring from UPMs to the
respective UPM input terminals in the Parallel Cabinet. Refer to Appendix A of
this manual for wiring and termination requirements and wiring access
information.
12.
Route bypass input and critical load output power cables to Parallel Cabinet
terminal blocks. Refer to Appendix A of this manual for wiring access
information.
Содержание BPIV 15 kVA
Страница 1: ...Parallel Cabinet 15 kVA and 30 kVA BPIV INSTALLATION OPERATION MANUAL...
Страница 2: ......
Страница 3: ...www powerware com BPIV INSTALLATION OPERATION MANUAL Parallel Cabinet 15 kVA and 30 kVA...
Страница 15: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section I Installation...
Страница 31: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section II Operation...
Страница 102: ...W 2 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 This Page Intentionally Left Blank...
Страница 103: ......
Страница 104: ...164201409 Rev B 164201409B...