System Event Messages
When a system event occurs, a message appears on the LCD screen in the UPM
Status area. This message is also is written to the Active Events log and may be
added to the Events History Log. The messages are divided into four categories:
Alarms, Notices, Status, and Commands. The following tables contain the events
displayed on the LCD System Events screen of the Control panel.
ALARMS
Message
Horn Phone Relay Log
Indication
Battery Over Voltage
1
No
1
HA Service Required
Battery Over Voltage OK
Off
No
1
HA Condition Cleared
Battery Time is Low
1
No
1
HA User Action Required
Battery Time is Low OK
Off
No
1
HA Condition Cleared
Battery Under Voltage
1
No
1
HA Shutdown Imminent
Battery Under Voltage OK
Off
No
1
HA Condition Cleared
Bypass Calibration Required
1
No
1
HA Service Required
Bypass Calibration Required OK
Off
No
1
HA Condition Cleared
Bypass Control Failure
1
4
1
A
Service Required
Bypass Overheating Shutdown
1
No
1
HA User Action Required
Bypass Overheating Shutdown OK
Off
No
1
HA Condition Cleared
Bypass Overheating Warning
1
No
1
HA Shutdown Imminent
Bypass Overheating Warning OK
Off
No
1
HA Condition Cleared
Bypass Phase Rotation
1
No
1
HA User Action Required
Bypass Phase Rotation OK
Off
No
1
HA Condition Cleared
Bypass Setup Required
1
No
1
HA Service Required
Bypass Setup Required OK
Off
No
1
HA Condition Cleared
Calibrate DC AutoBalance
1
4
1
HA Service Required
Calibrate DC AutoBalance OK
Off
No
1
HA Condition Cleared
Charger Failure
1
4
1
HA Service Required
Charger Failure OK
Off
No
1
HA Condition Cleared
Check Battery
1
No
1
HA User Action Required
Check Battery OK
Off
No
1
HA Condition Cleared
Check Boost
1
4
1
HA Service Required
Check Boost OK
Off
No
1
HA Condition Cleared
Check CSB Setup
1
No
1
HA Service Required
Check CSB Setup OK
Off
No
1
HA Condition Cleared
Check Inverter
1
No
1
HA Service Required
Check Inverter OK
Off
No
1
HA Condition Cleared
Содержание BPIV 15 kVA
Страница 1: ...Parallel Cabinet 15 kVA and 30 kVA BPIV INSTALLATION OPERATION MANUAL...
Страница 2: ......
Страница 3: ...www powerware com BPIV INSTALLATION OPERATION MANUAL Parallel Cabinet 15 kVA and 30 kVA...
Страница 15: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section I Installation...
Страница 31: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section II Operation...
Страница 102: ...W 2 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 This Page Intentionally Left Blank...
Страница 103: ......
Страница 104: ...164201409 Rev B 164201409B...