POWER WIRING INSTALLATION NOTES
164201409---1
A---9
Powerware BPIV Parallel Cabinet Installation and Operation
164201409 REV. B
101503
11.
Per NEC article 300-20(a), all three phase conductors must be run in the same conduit.
Neutral and ground must be run in the same conduit as the phase conductors.
12.
Conduit is sized to accommodate one neutral conductor and one ground conductor the
same size as the phase conductor. For installations requiring an oversized neutral
conductor, refer to NEC Table C1 for proper conduit size.
13.
Conduit sizes were chosen from NEC Table C1, type letters RHH, RHW, RHW-2, TW, THW,
THHW, THW-2.
Table M. Parallel Cabinet Power Cable Conduit Requirements
Powerware BPIV--15
Powerware BPIV
System
Configuration
Terminal
Number of
Wires in
Conduit
Minimum
Conduit
Trade Size
(inches)
Number of
Conduits
AC Input from UPM
(A, B, C, Neut, Gnd)
Refer to Powerware BPIV UPS Installation
and Operation manual for conduit data.
1+1
AC Input to Bypass
(A, B, C, Neut, Gnd)
5
1.0
1
Output
(A, B, C, Neut, Gnd)
5
1.0
1
AC Input from UPM
(A, B, C, Neut, Gnd)
Refer to Powerware BPIV UPS Installation
and Operation manual for conduit data.
2+0
AC Input to Bypass
(A, B, C, Neut, Gnd)
5
1.5
1
Output
(A, B, C, Neut, Gnd)
5
1.5
1
AC Input from UPM
(A, B, C, Neut, Gnd)
Refer to Powerware BPIV UPS Installation
and Operation manual for conduit data.
2+1
AC Input to Bypass
(A, B, C, Neut, Gnd)
5
1.5
1
Output
(A, B, C, Neut, Gnd)
5
1.5
1
AC Input from UPM
(A, B, C, Neut, Gnd)
Refer to Powerware BPIV UPS Installation
and Operation manual for conduit data.
3+0
AC Input to Bypass
(A, B, C, Neut, Gnd)
5
2.0
1
Output
(A, B, C, Neut, Gnd)
5
2.0
1
AC Input from UPM
(A, B, C, Neut, Gnd)
Refer to Powerware BPIV UPS Installation
and Operation manual for conduit data.
3+1
AC Input to Bypass
(A, B, C, Neut, Gnd)
5
2.0
1
Output
(A, B, C, Neut, Gnd)
5
2.0
1
Содержание BPIV 15 kVA
Страница 1: ...Parallel Cabinet 15 kVA and 30 kVA BPIV INSTALLATION OPERATION MANUAL...
Страница 2: ......
Страница 3: ...www powerware com BPIV INSTALLATION OPERATION MANUAL Parallel Cabinet 15 kVA and 30 kVA...
Страница 15: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section I Installation...
Страница 31: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section II Operation...
Страница 102: ...W 2 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 This Page Intentionally Left Blank...
Страница 103: ......
Страница 104: ...164201409 Rev B 164201409B...