
A---14
Powerware BPIV Parallel Cabinet Installation and Operation
164201409 REV. B
101503
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
A
2 of 2
061502
CUSTOMER INTERFACE WIRING
INSTALLATION NOTES
164201409---2
UPM
1
UPM
2
UPM
3
UPM
4
PARALLEL
TERMINATION
POINT
(JUMPER J40
INSTALLED
)
Arrangement A
CAN
CAN WIRING AND TERMINATIONS
CABINET
NO
TERMINATION
(JUMPER J40
REMOVED)
SELF
TERMINATING
UPM
4
UPM
1
UPM
2
UPM
3
PARALLEL
TERMINATION
POINT
(JUMPER J40
INSTALLED
)
Arrangement B
CAN
CABINET
NO
TERMINATION
(JUMPER J40
REMOVED)
SELF
TERMINATING
(IF INSTALLED)
(IF INSTALLED)
(IF INSTALLED)
(IF INSTALLED)
NOTE:
This drawing is for Parallel Cabinet wiring
purposes and is not a floor layout plan.
UPMs and the Parallel Cabinet can be
placed in any physical order, but must be
wired in the order shown in the drawing.
Содержание BPIV 15 kVA
Страница 1: ...Parallel Cabinet 15 kVA and 30 kVA BPIV INSTALLATION OPERATION MANUAL...
Страница 2: ......
Страница 3: ...www powerware com BPIV INSTALLATION OPERATION MANUAL Parallel Cabinet 15 kVA and 30 kVA...
Страница 15: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section I Installation...
Страница 31: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section II Operation...
Страница 102: ...W 2 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 This Page Intentionally Left Blank...
Страница 103: ......
Страница 104: ...164201409 Rev B 164201409B...