3--7
Powerware BPIV Parallel Cabinet Installation and Operation
164201409 REV. B
101503
If at any time during the battery discharge the input power becomes available
again, the rectifier will begin to supply DC current to the inverter. At this point, the
unit returns to normal operation.
If the input power fails to return or is not within the acceptance windows required
for normal operation, the battery will continue discharging until a DC voltage level is
reached where the inverter output can no longer support the connected loads.
When this occurs, the unit will issue another set of audible and visual alarms
indicating SHUTDOWN IMMINENT. Unless the rectifier has a valid input soon, the
output will only be supported for 2 minutes before the output of the system shuts
down. If the bypass source is available, the system will transfer to Bypass instead
of shuting down.
The systems total operating time on battery will depend on many factors. Some
factors that affect battery support times are battery type and capacity, number of
parallel strings, environmental temperatures, age of the battery, and fluctuations in
load demand during the discharge. The greater the load, the less support time the
battery will have. Decrease the load, and the battery support time will generally
increase.
Содержание BPIV 15 kVA
Страница 1: ...Parallel Cabinet 15 kVA and 30 kVA BPIV INSTALLATION OPERATION MANUAL...
Страница 2: ......
Страница 3: ...www powerware com BPIV INSTALLATION OPERATION MANUAL Parallel Cabinet 15 kVA and 30 kVA...
Страница 15: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section I Installation...
Страница 31: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section II Operation...
Страница 102: ...W 2 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 This Page Intentionally Left Blank...
Страница 103: ......
Страница 104: ...164201409 Rev B 164201409B...