2--8
Powerware BPIV Parallel Cabinet Installation and Operation
164201409 REV. B
101503
2.5.1
Installation Checklist
-
All packing materials and restraints have been removed from each cabinet.
-
Each cabinet in the Parallel System is placed in its installed location.
-
A cabinet grounding/mounting kit is installed between any cabinets that are bolted
together.
-
All conduits, and cables are properly routed to the UPMs, Parallel Cabinet and
auxiliary cabinets.
-
All power cables are properly sized and terminated.
-
The bypass source feeding the bypass of the Parallel Cabinet and the UPMs is from
the same source of supply and is a four wire wye configuration.
-
A ground conductor is properly installed.
-
Control wiring between the UPMs and the Parallel Cabinet is properly installed.
-
CAN is correctly terminated at UPMs.
-
Air conditioning equipment is installed and operating correctly.
-
The area around the installed Parallel System is clean and dust-free. (It is
recommended that the Parallel System be installed on a level floor suitable for
computer or electronic equipment.)
-
Adequate workspace exists around the UPMs, Parallel Cabinet, and other cabinets.
-
Adequate lighting is provided around all Parallel System equipment.
-
A 120VAC service outlet is located within 25 feet of the UPMs and Parallel equipment.
-
Building alarms are wired appropriately.
-
Startup and operational checks performed by authorized service personnel.
Содержание BPIV 15 kVA
Страница 1: ...Parallel Cabinet 15 kVA and 30 kVA BPIV INSTALLATION OPERATION MANUAL...
Страница 2: ......
Страница 3: ...www powerware com BPIV INSTALLATION OPERATION MANUAL Parallel Cabinet 15 kVA and 30 kVA...
Страница 15: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section I Installation...
Страница 31: ...Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 Section II Operation...
Страница 102: ...W 2 Powerware BPIV Parallel Cabinet Installation and Operation 164201409 REV B 101503 This Page Intentionally Left Blank...
Страница 103: ......
Страница 104: ...164201409 Rev B 164201409B...