
3101 111th Street SW
•
Suite F
•
Everett, WA 98204
425-353-7552
•
plcmultipoint.com
207
L
Re
v1
43
Gateway Commissioning & Start-up Guide
Creating New Schedules
To add a new schedule, tap the “+” symbol in the bottom right section of the
schedule editing screen.
After tapping the “+” button, a new schedule with the name “New Schedule” will be
automatically created within a time adjacent to the existing schedule and is ready to be
modified to suit the specific lighting needs.
The L Gateway allows for up to 4 scheduled lighting adjustments per day for each
zone. When attempting to add more than 4 schedules, the following screen will appear.
Press “OK” to return to the schedule editing screen.
When finished editing schedules, press “Save” to return to the Schedule View.
Deleting a Schedule
In zones with more than one schedule programmed, it is possible to delete a schedule
using the following steps.
Within the schedule editing screen, tap the schedule that is intended to be deleted. In this
example, the schedule named “New Schedule” has been selected.
Tap the button with the “-“ symbol to delete the selected schedule.
Tap “Cancel” to retain the schedule that was deleted (in case it was inadvertently deleted)
or tap “Save” to accept the change and return to the Schedule View.