Gateway Commissioning & Start-up Guide
Modifying Day Groupings
As many projects require different schedules depending on the day of the week, the L Gateway allows for further
customization of schedules to be run on different day groupings per zone. Day groupings are customizable to ensure that
schedules are repeated on the specific days of the week that best accommodate the building use schedules.
As an example of day groupings, a project may require separate schedules based on the days of the week as follows:
• Day grouping 1: Monday/Tuesday/Wednesday/Thursday/Friday
• Day grouping 2: Saturday/Sunday
To adjust the day groupings within the schedule editing screen, tap the “v” icon in the upper-right segment of the screen visible
next to abbreviated days of the week.
A drop-down tool will appear as seen in this example image.
To create a new day grouping, tap “Add a new day grouping”.
Tapping “Add a new day grouping” will launch a day selection tool.
Tap the days of the week that should be included in the day grouping.