
3101 111th Street SW
•
Suite F
•
Everett, WA 98204
425-353-7552
•
plcmultipoint.com
207
L
Re
v1
26
Gateway Commissioning & Start-up Guide
Testing Devices
After completing the process of scanning for lights, the next step is to test the devices that were discovered.
To proceed with testing, begin in the Device View for the zone that has been created. Instructions on reaching the Device View
can be found in the preceding section.
Once in the Device View, complete the following actions.
Lights
To test lights, systematically toggle each light on and off to ensure that the specific light is responding.
Tapping the virtual switch next to a specific light will change its state between on and off.
Return to the Schedule View: Once all devices/lights have been tested, tap “Done” in the upper left of the Device View screen.
Testing a Zone
In addition to testing the individual devices within a zone, it is also possible to test all the lights
in the zone simultaneously.
To test all the lights within a zone, start within the Schedule View.
Tapping the lightbulb icon within the center of the schedule wheel will allow the entire zone
to be toggled on or off, alternating from the last state.
The bottom section of the Schedule View will depict the Brightness settings (when applicable)
for the most recent scheduled event. These settings can be overridden using the controls on this
screen. Schedule overrides will remain active until the next scheduled event.
While pressing the circular button on the horizontal slider bar for Brightness, slide the button
left or right to adjust the light output. Movement of the button to the right will increase the light
output, while movement to the left will decrease the light output.
Changes to Brightness should be visible immediately as they override the schedule. Override settings will reset at the end of the
current schedule.