5/4 X 3 X 28-1/2" PANEL SLAT
A
B
D
C
#8 X 2" WOOD SCREW
2-1/2"
2 -7/8"
STEP 12: PANEL SLATS
1: INSTALL THE FIRST PANEL SLAT 2-1/2" FROM THE CORNER POST. THEN INSTALL THE REMAINING FOUR PANEL SLATS
2-7/8" APART AS SHOWN.
2: ATTACH THE PANEL SLATS ONTO THE FRONT AND RIGHT SIDES OF THE TOWER WITH 2" WOOD SCREWS IN THE
PRE-DRILLED HOLES.
190
Содержание Everest Extreme 1500MW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 DESCRIPTION PICTURE QTY IRON DUCTILE SWING HANGER 11 4012 56...
Страница 67: ...DESCRIPTION PICTURE QTY DORMER 1 2 1 1529 BOX UNASSEMBLED TELESCOPE 07 0001 UNASSEMBLED CHIMNEY 1529 BOX 57...
Страница 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Страница 217: ...APPENDIX 207...