STEP 18: LEVELING THE LOWER LEVEL FRAME
1: INSTALL LAG SCREWS ONLY IN THE THREE 2 X 6 BOARDS AT DECK HEIGHT AT THIS TIME.
SQUARE EACH OF THESE THREE BOARDS TO THE LOWER LEVEL CORNER POSTS AND THEN
INSTALL THE LAG SCREWS. THIS IS TO MAKE THE STRUCTURE RIGID FOR THE LEVELING AND
SQUARING PROCESS.
2: FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO LEVEL AND SQUARE THE
STRUCTURE. DO NOT INSTALL REMAINING LAG SCREWS UNTIL AFTER THE FRAME HAS BEEN
LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT
THE 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS IN ALL OF THE REMAINING HOLES OF
THE 2 X 6 PARTS ON THE FRONT OF THE PLAY SET. NOTE: THERE WILL NOT BE ANY PREDRILLED
HOLES IN THE LOWER LEVEL CORNER POSTS FOR THE LAG SCREWS.
WASHERS FIRST. THEN LEVEL/SQUARE THE
POSTS , THEN INSTALL LAG SCREWS AND
REMAINING 2 X 6 BOARDS.
FRAME. FINALLY, INSTALL LAG SCREWS IN THE
LAG SCREW
5/16" WASHER
***IMPORTANT***
SQUARE THESE THREE BOARDS TO THE CORNER
5/16" X 3-1/2"
FRONT OF FORT
80
Содержание Everest Extreme 1500MW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 DESCRIPTION PICTURE QTY IRON DUCTILE SWING HANGER 11 4012 56...
Страница 67: ...DESCRIPTION PICTURE QTY DORMER 1 2 1 1529 BOX UNASSEMBLED TELESCOPE 07 0001 UNASSEMBLED CHIMNEY 1529 BOX 57...
Страница 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Страница 217: ...APPENDIX 207...