A
PANEL BOARD
REAR BOTTOM
2 X 6 X 42-1/2"
2 X 6 X 30-7/16"
SIDE BOTTOM
PANEL BOARD
B
STEP 52: UPPER LEVEL BOTTOM PANEL BOARDS
LAG SCREWS AND
5/16" WASHERS
WITH 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
PANEL BOARD INSTALLED IN SUBSTEP 1. FASTEN THE REAR BOTTOM PANEL BOARD TO THE POSTS
OF THE UPPER LEVEL. MAKE THE TOP OF THE BOARD EVEN WITH THE TOP OF THE SIDE BOTTOM
5/16" WASHERS
HEX BOLTS AND
5/16" X 4-1/2"
1: PLACE THE 2 X 6 X 30-7/16" SIDE BOTTOM PANEL BOARD (OFFSET UP) ON THE SWING BEAM
SIDE (RIGHT SIDE) OF THE PLAYSET. ATTACH THE TOP HOLES OF THE BOARD TO THE POSTS WITH
5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS. ATTACH THE BOTTOM HOLES WITH 5/16" X 3-1/2"
LAG SCREWS AND 5/16" WASHERS.
2: PLACE THE 2 X 6 X 42-1/2" REAR BOTTOM PANEL BOARD (OFFSET DOWN) ON THE BACK SIDE
5/16" X 3-1/2"
DETAIL A
SCALE 1 : 7
AND 5/16" WASHERS
LAG SCREWS
DETAIL B
SCALE 1 : 7
5/16" X 3-1/2"
115
Содержание Everest Extreme 1500MW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 DESCRIPTION PICTURE QTY IRON DUCTILE SWING HANGER 11 4012 56...
Страница 67: ...DESCRIPTION PICTURE QTY DORMER 1 2 1 1529 BOX UNASSEMBLED TELESCOPE 07 0001 UNASSEMBLED CHIMNEY 1529 BOX 57...
Страница 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Страница 217: ...APPENDIX 207...