Safety Guidelines……………………………………….......……...........................Pages 4-7
Leveling Fort, General Information and Definitions............................................Pages 7-9
How to Install T-nuts, Board Identification, Predrill Lag Screw Directions and
Swing Beam Loading......................................................................................Pages 10-14
Site Plan, Required Tool List and Kit Contents ……………………….............Pages 15-16
Hardware, Lumber and Accessory Checklists……………………………........Pages 17-61
Adding T-Nuts to Corner Posts (Middle Level Deck)...………..………...….............. Step 1
Swing Beam Plate................................................................................................... Step 2
Framing Middle Level.…………………………..…………………………..……... Steps 3-10
Deck Spacer and Deck Assembly…………....……………...…………...…...... Steps 11-13
Framing Front Level…………………...…………...…..……..……...….……..... Steps 14-20
Deck Spacer and Deck Assembly.……………………..……............................ Steps 21-23
Panel Supports Front Level................................................................................... Step 24
Building and Mounting Ladder Front Level..................................................... Steps 25-26
Lower Level Steps................................................................................................. Step 27
Middle Level Center Post...................................................................................... Step 28
Building and Mounting Rockwall…………….……………………..……........… Steps 29-33
Angle Supports.................................................................................................... Step 33A
Adding T-Nuts to Corner Posts (Upper Level Deck).............................................. Step 34
Framing Upper Level Deck............................................................................. Steps 35-43
Upper Level Deck........................................................................................... Steps 44-48
Upper Level Center Post and Railing............................................................. Steps 49-50
Assembling and Attaching Radical Ride Slide....................................................... Step 51
Upper Level Bottom Panel Boards, Steps and Rear Center Post.................. Steps 52-54
Upper Level, Middle Level and Lower Level Panel Slats..……...………....... Steps 55-57
Swing Beam Assembly………………………………………………………........Steps 58-64
Hanging Swings……………………………………………………….…….……......... Step 65
TABLE OF CONTENTS
2
Содержание Everest Extreme 1500MW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 DESCRIPTION PICTURE QTY IRON DUCTILE SWING HANGER 11 4012 56...
Страница 67: ...DESCRIPTION PICTURE QTY DORMER 1 2 1 1529 BOX UNASSEMBLED TELESCOPE 07 0001 UNASSEMBLED CHIMNEY 1529 BOX 57...
Страница 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Страница 217: ...APPENDIX 207...