WASHERS FIRST. THEN LEVEL/SQUARE THE
POSTS , THEN INSTALL LAG SCREWS AND
REMAINING 2 X 6 BOARDS.
FRAME. FINALLY, INSTALL LAG SCREWS IN THE
LAG SCREWS
FRONT OF FO
RT
***IMPORTANT***
SQUARE THESE FOUR BOARDS TO THE CORNER
5/16" X 3-1/2"
5/16" WASHER
STEP 8: LEVELING THE PLAY SET AND LAGS
1: INSTALL LAG SCREWS ONLY IN THE FOUR 2 X 6 BOARDS AT DECK HEIGHT AT THIS TIME.
SQUARE EACH OF THESE FOUR BOARDS TO THE CORNER POSTS AND THEN INSTALL THE LAG
SCREWS. THIS IS TO MAKE THE STRUCTURE RIGID FOR THE LEVELING AND SQUARING PROCESS.
2: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT
OF THE MANUAL TO LEVEL AND SQUARE THE STRUCTURE. HAVE AN ASSISTANT HELP YOU
LIFT THE FRAME AS REQUIRED. DO NOT INSTALL REMAINING LAG SCREWS UNTIL AFTER THE
FRAME HAS BEEN LEVELED AND SQUARED.
3: ONCE THE FRAME IS LEVEL, SQUARE AND SET INTO POSITION; GO BACK AND INSERT
THE 5/16" X 3-1/2" LAG SCREWS AND 5/16" WASHERS IN ALL OF THE REMAINING HOLES OF
THE 2 X 6 PARTS ON THE FRONT, SIDES AND REAR OF THE PLAY SET. NOTE: THERE WILL NOT
BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG SCREWS.
69
Содержание Everest Extreme 1500MW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 DESCRIPTION PICTURE QTY IRON DUCTILE SWING HANGER 11 4012 56...
Страница 67: ...DESCRIPTION PICTURE QTY DORMER 1 2 1 1529 BOX UNASSEMBLED TELESCOPE 07 0001 UNASSEMBLED CHIMNEY 1529 BOX 57...
Страница 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Страница 217: ...APPENDIX 207...