STEP 17: BRIDGE DECK AND CHAIN ASSEMBLY
1: LOCATE TWO 96" CHAIN SECTIONS THAT SHIPPED WITH THE CLATTER BRIDGE.
2: PLACE THE CHAINS OVER THE HOLES IN THE BRIDGE DECK BOARDS AS SHOWN BELOW.
3: LINE UP THE 18TH LINK IN THE CHAINS WITH THE FIRST BRIDGE DECK BOARD HOLES.
96" CHAIN SECTIONS
B
DETAIL B
SCALE 1 : 6
18TH CHAIN LINK
(LINE UP OVER HOLE
IN FIRST BRIDGE DECK
BOARD)
FIRST BRIDGE
DECK BOARD
195
Содержание Everest Extreme 1500MW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 DESCRIPTION PICTURE QTY IRON DUCTILE SWING HANGER 11 4012 56...
Страница 67: ...DESCRIPTION PICTURE QTY DORMER 1 2 1 1529 BOX UNASSEMBLED TELESCOPE 07 0001 UNASSEMBLED CHIMNEY 1529 BOX 57...
Страница 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Страница 217: ...APPENDIX 207...