A
C
B
TOWER
FRONT OF
TOWER
LEFT SIDE OF
PANEL BOARD
2 X 6 BOTTOM
RIGHT SIDE
FLUSH HERE
THE BOARDS
MAKE TOP OF
BOARD (HOLES
5/16" WASHER
OF THE DECK)
FLUSH TO THE TOP
OF THE BOARD
BOARD (MAKE TOP
OFFSET DOWN)
2 X 4 X 36-3/4"
BOTTOM PANEL
2 X 6 X 36-3/4"
BOTTOM PANEL
5/16" X 3-1/2"
LAG SCREW
D
STEP 11: BOTTOM PANEL BOARDS
1: PLACE THE 2 X 4 X 36-3/4" BOTTOM PANEL BOARD AGAINST THE LEFT SIDE CORNER POSTS, AND LEVEL THE TOP OF
THE BOARD WITH THE TOP OF THE DECK BOARDS.
2: FASTEN THE BOTTOM PANEL BOARD TO THE CORNER POSTS WITH 5/16 X 3-1/2" LAG SCREWS WITH 5/16"
WASHERS.
3: PLACE THE 2 X 6 X 36-3/4" BOTTOM PANEL BOARD AGAINST THE FRONT CORNER POSTS. THE TOP OF THE BOARD
SHOULD BE 1/4" ABOVE THE 2 X 6 ON THE RIGHT SIDE OF THE TOWER
4: FASTEN THE BOTTOM PANEL BOARD TO THE CORNER POSTS WITH 5/16 X 3-1/2" LAG SCREWS WITH 5/16"
WASHERS.
189
Содержание Everest Extreme 1500MW
Страница 6: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 8: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 66: ...6 BRACKET 4 11 4003 GREEN 11 5013 90 SPRING CLIP 6 DESCRIPTION PICTURE QTY IRON DUCTILE SWING HANGER 11 4012 56...
Страница 67: ...DESCRIPTION PICTURE QTY DORMER 1 2 1 1529 BOX UNASSEMBLED TELESCOPE 07 0001 UNASSEMBLED CHIMNEY 1529 BOX 57...
Страница 188: ...PART 2 CLATTER BRIDGE ASSEMBLY 178...
Страница 217: ...APPENDIX 207...