11
M360 Firebox Installation Instructions
February 2015
1.1 SINGLE CHIMNEY OR FLUE WAY
Every appliance must have a vertical flue pipe operating by natural draught to discharge
the combustion gases outdoors. The flue must:
comply with regulations in force in the place of installation of the appliance;
be tight to the products of combustion, waterproof, suitably insulated, made with
materials resistant to the corrosion of the gases and to stress;
be connected to just one fireplace, fireplace or extraction hood (Fig.2);
be properly sized, with constant free internal section, equal to or greater than the
diameter of the flue pipe of the fireplace and at least 3.5 m in length (Fig.2);
be mainly in a vertical position with a deflection from the axis of no more than 45° (Fig.
2);
be at a suitable distance from combustible or flammable materials, ensured by an air gap
or suitable insulating material (Fig.3);
be of uniform internal section, preferably round. Square or rectangular sections must
have rounded corners with a radius of at least 20 mm and a maximum ratio between the
sides of 1.5 (Fig. 3-4-5);
the walls must be smooth if possible and without narrowing; bends must be regular and
without discontinuity (Fig.6).
It is forbidden to make fixed or mobile apertures on the flue pipe to connect
appliances other than the one to which it is already connected.
It is forbidden to pass other air ducts or service pipes inside the flue pipe, however
large it is.
If the flue pipe is an incorrect size or installed other than in compliance with the
above instructions, Gruppo Piazzetta S.p.A. cannot be held liable for malfunctioning
of the product, damage to property or injury to persons or animals.
1.2 SOOT INSPECTION
We recommend that the flue must have a chamber for collecting solid matter and any condensate located below the connection and which may be easily
inspected by means of an airtight door. (Fig. 1)
Содержание M 360
Страница 2: ...2 M360 Firebox Installation Instructions February 2015 ...
Страница 18: ...18 M360 Firebox Installation Instructions February 2015 2 6 DIMENSIONS Non Combustible Ceiling e g concrete ...
Страница 19: ...19 M360 Firebox Installation Instructions February 2015 ...
Страница 20: ...20 M360 Firebox Installation Instructions February 2015 2 7 WIRING DIAGRAM ...
Страница 21: ...21 M360 Firebox Installation Instructions February 2015 PCB INTERNAL CONNECTIONS CMF CMF ...
Страница 42: ...42 M360 Firebox Installation Instructions February 2015 ...
Страница 43: ...43 M360 Firebox Installation Instructions February 2015 ...
Страница 44: ...44 M360 Firebox Installation Instructions February 2015 ...
Страница 45: ...45 M360 Firebox Installation Instructions February 2015 ...
Страница 46: ...46 M360 Firebox Installation Instructions February 2015 ...
Страница 47: ...47 M360 Firebox Installation Instructions February 2015 ...