This section is devoted to the operations that can be carried out on the vehicle bodywork.
CAUTION
WE STRONGLY RECOMMEND NOT TO CLEAN THE PAINTED PLASTIC PARTS WITH SOLVENTS
CONTAINING PETROL OR PETROL BY-PRODUCTS.
Seat
•
Raise the saddle
•
Undo the three screws fixing the plate
to the central cover and remove the
saddle.
Side fairings
- The scooter has two self-sticking mouldings placed on the side fairings.
- To replace them, remove the relevant part, clean the surface accurately and apply the new moulding.
Driving mirrors
•
Remove the joint rubber of the mirror
housing from the bottom;
•
Unscrew the two screws, then remove
the covering from the support arm;
•
Remove the 2 lower retainers fixings
the mirror to the frame.
XEVO 400ie
Chassis
CHAS - 305
Содержание 2005 XEVO 400ie
Страница 1: ...MANUALE STAZIONE DI SERVIZIO XEVO 400ie...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Страница 16: ...INDEX OF TOPICS MAINTENANCE MAIN...
Страница 31: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Страница 35: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Страница 67: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Страница 72: ...INDEX OF TOPICS ENGINE ENG...
Страница 170: ...INDEX OF TOPICS INJECTION INJEC...
Страница 263: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Страница 282: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Страница 295: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Страница 304: ...INDEX OF TOPICS CHASSIS CHAS...
Страница 322: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Страница 326: ...INDEX OF TOPICS TIME TIME...
Страница 374: ...Stickers TRANSFERS Code Action Duration 1 004159 Plates Stickers Replacement Time XEVO 400ie TIME 374...
Страница 376: ...T Tank 317 350 Technical Data Transmission 9 32 73 88 339 Turn indicators 48 Tyres 9...