Refitting the driven pulley
- Insert the new oil guards
- Insert the new O-rings
N.B.
O-RINGS ARE OF TWO SIZES. THE LARGE ONE IS INSTALLED ON THE MACHINING END RA-
DIUS, AT THE BASE OF THE HALF-PULLEY.
- Install the half-pulley on the bushing being careful
not to damage the top sealing ring during the in-
troduction.
- Make sure the pins and collar are not worn, re-
assemble the pins and collar.
- Using a bent beak greaser, lubricate the driven pulley unit with about 10 gr. of grease, this operation
should be carried out through one of the two holes into the bushing to obtain the exit of the grease from
the opposite hole. This operation is necessary to avoid the presence of grease beyond the O-rings.
Inspecting the clutch spring
- Measure the length of the movable driven half-
pulley spring while it is unloaded.
Characteristic
Standard length:
125.5 mm
Admissible limit after use:
120 mm
Engine
XEVO 400ie
ENG - 82
Содержание 2005 XEVO 400ie
Страница 1: ...MANUALE STAZIONE DI SERVIZIO XEVO 400ie...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Страница 16: ...INDEX OF TOPICS MAINTENANCE MAIN...
Страница 31: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Страница 35: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Страница 67: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Страница 72: ...INDEX OF TOPICS ENGINE ENG...
Страница 170: ...INDEX OF TOPICS INJECTION INJEC...
Страница 263: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Страница 282: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Страница 295: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Страница 304: ...INDEX OF TOPICS CHASSIS CHAS...
Страница 322: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Страница 326: ...INDEX OF TOPICS TIME TIME...
Страница 374: ...Stickers TRANSFERS Code Action Duration 1 004159 Plates Stickers Replacement Time XEVO 400ie TIME 374...
Страница 376: ...T Tank 317 350 Technical Data Transmission 9 32 73 88 339 Turn indicators 48 Tyres 9...