YES go to 16 NO go to 15
15
- Check cable harness and connectors more carefully.
16
- Connect the control unit connector.
Set the switch to «
ON
» with switch to «
RUN
» and side stand raised. Repeat the «
ON
» «
OFF
» «
ON
»
switching.
Check the presence of voltage pulses on the Stepper command lines.
Set-up for direct voltage measurements.
N.B.
PULSES ARE USED TO CHANGE THE STEPPER POSITION.
Electric characteristic
14-24 =
V (pulses for a few seconds)
6-21 =
V (pulses for a few seconds)
After reaching the optimum position, the power supply voltage becomes null.
YES go to 17 NO go to 18
17
- The Stepper circuit is efficient.
18
- Check the control unit connector. Replace the control unit, if necessary.
Lambda probe
SIGNAL CONTROL
XEVO 400ie
Injection
INJEC - 257
Содержание 2005 XEVO 400ie
Страница 1: ...MANUALE STAZIONE DI SERVIZIO XEVO 400ie...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Страница 16: ...INDEX OF TOPICS MAINTENANCE MAIN...
Страница 31: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Страница 35: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Страница 67: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Страница 72: ...INDEX OF TOPICS ENGINE ENG...
Страница 170: ...INDEX OF TOPICS INJECTION INJEC...
Страница 263: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Страница 282: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Страница 295: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Страница 304: ...INDEX OF TOPICS CHASSIS CHAS...
Страница 322: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Страница 326: ...INDEX OF TOPICS TIME TIME...
Страница 374: ...Stickers TRANSFERS Code Action Duration 1 004159 Plates Stickers Replacement Time XEVO 400ie TIME 374...
Страница 376: ...T Tank 317 350 Technical Data Transmission 9 32 73 88 339 Turn indicators 48 Tyres 9...