Removal
- Remove the front handlebar cover.
- Drain off the braking system corresponding to the
circuit being tested.
- Remove the two fixing screws from the brake
pump to the handlebar indicated in the photo-
graph.
- Remove the oil pipe fitting from the pump undoing
the screw indicated in the figure.
- Remove the stop light switch connector
BRAKE PUMP TECHNICAL DATA
Specification
Desc./Quantity
Pump right piston diameter:
Ø 12
Pump left piston diameter:
Ø 15
Refitting
To refit, carry out the removal operations but in reverse order, observing the specified torques.
N.B.
USE NEW COPPER GASKETS ON THE JOINTS.
CAUTION
ONCE REFITTING IS FINISHED, BLEED THE SYSTEM.
Locking torques (N*m)
Pipe / brake calliper coupling
20 ÷ 25
Braking system
XEVO 400ie
BRAK SYS - 294
Содержание 2005 XEVO 400ie
Страница 1: ...MANUALE STAZIONE DI SERVIZIO XEVO 400ie...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Страница 16: ...INDEX OF TOPICS MAINTENANCE MAIN...
Страница 31: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Страница 35: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Страница 67: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Страница 72: ...INDEX OF TOPICS ENGINE ENG...
Страница 170: ...INDEX OF TOPICS INJECTION INJEC...
Страница 263: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Страница 282: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Страница 295: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Страница 304: ...INDEX OF TOPICS CHASSIS CHAS...
Страница 322: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Страница 326: ...INDEX OF TOPICS TIME TIME...
Страница 374: ...Stickers TRANSFERS Code Action Duration 1 004159 Plates Stickers Replacement Time XEVO 400ie TIME 374...
Страница 376: ...T Tank 317 350 Technical Data Transmission 9 32 73 88 339 Turn indicators 48 Tyres 9...