- Loosen the 14 fastening screws.
- Remove the flywheel cover with the relevant gas-
ket and the cooling system sleeve support.
N.B.
THE SCREWS ARE OF 4 DIFFERENT LENGTHS. NOTE
THE RELEVANT POSITIONS.
CAUTION
REMOVE THE COVER AVOIDING ANY POSSIBLE INTERFERENCE BETWEEN STATOR AND
ROTOR.
CAUTION
BE CAREFUL TO PREVENT SLIPPAGE OF THE BY-PASS VALVE AND OF THE RELEVANT
SPRING.
Removing the flywheel cover components
- Loosen the six mounting screws and remove the
water pump cover.
- Remove the by-pass and the relevant spring.
- Remove the oil pump seal.
XEVO 400ie
Engine
ENG - 99
Содержание 2005 XEVO 400ie
Страница 1: ...MANUALE STAZIONE DI SERVIZIO XEVO 400ie...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Страница 16: ...INDEX OF TOPICS MAINTENANCE MAIN...
Страница 31: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Страница 35: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Страница 67: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Страница 72: ...INDEX OF TOPICS ENGINE ENG...
Страница 170: ...INDEX OF TOPICS INJECTION INJEC...
Страница 263: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Страница 282: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Страница 295: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Страница 304: ...INDEX OF TOPICS CHASSIS CHAS...
Страница 322: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Страница 326: ...INDEX OF TOPICS TIME TIME...
Страница 374: ...Stickers TRANSFERS Code Action Duration 1 004159 Plates Stickers Replacement Time XEVO 400ie TIME 374...
Страница 376: ...T Tank 317 350 Technical Data Transmission 9 32 73 88 339 Turn indicators 48 Tyres 9...