SERVICE OPERATIONS
39
Reproduction or translation, even partial, is forbidden without the written consent of Peugeot Scooters
Removal of the drive pulley
- Remove the upper RH fairing. See: Procedure 6.
page 21
- Removal of the primary transmission cover.
- Hold the fixed flange with tool P/N 752237.
- Remove the nut and the washer.
- Remove the fixed flange.
- Pull the belt aside (1).
- Remove the drive pulley (2) with the guide
hub (3).
Removal of the driven pulley
- Lock the clutch drum (1) with the pin wrench
P/N 752237.
- Remove the nut and the washer.
- Remove the clutch drum, the clutch drive pulley
and driven pulley assembly and belt.
Make a note of the direction of rotation of
the belt.
752237
3
2
1
1
752237