
P
P
E
E
S
S
1
1
9
9
0
0
0
0
G
G
i
i
G
G
S
S
M
M
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
— Chapter 5. Installing the Growth Cabinet
PES1900NR Operations Manual
86
RF Cable Vertical Mounting Instructions
If the repeater and growth cabinets are mounted vertically, you must remove the RF cables and
ribbon cable from the longer length of conduit, and thread them through the shorter length of conduit.
1. Unscrew the ferrule completely off the longer conduit, and slide the gland ring and
cap nut off.
2. Install these three parts onto the shorter length of conduit.
3. Transfer the connectors from the longer to the shorter piece of conduit.
4. Thread the cables through the flexible conduit, and through the connector.
Figure 64 RF Cable, Growth Cabinet End