
P
P
E
E
S
S
1
1
9
9
0
0
0
0
G
G
i
i
G
G
S
S
M
M
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
PES1900NR Operations Manual
Chapter 4. Mounting the PES1900GI NR — 41
Chapter 4. Mounting the PES1900Gi NR
Installation Overview
The PES1900Gi NR can be mounted on a pole or on the wall of a building. The unit’s compact
cabinet simplifies installation, and its aesthetically-acceptable design means that it conforms to
zoning standards in many locations.
RepeaterNet Craft software is required, throughout the physical installation of the repeater. Before
installing the repeater, do the following:
1.
Pre-load the Craft software, onto the laptop computer that you will use at the installation site.
See
RepeaterNet Craft for the PES1900Gi NR
, for information about installing and using
RepeaterNet software.
2.
Retrieve the DB-9 cable from the Repeater Accessory Kit. Use this cable to connect the laptop
with the repeater.
NOTE: Only qualified service or technical personnel should install the repeater.
Mounting Associated Equipment and Space Planning
Mount the optional Back-Up Power Supply (BUPS) and any other associated equipment before
mounting and wiring the repeater.
If the repeater site requires two channels, install both a main (primary passband channel) repeater,
and a growth cabinet (to house the second channel). Be sure to allow enough space, either above or
to the left of the main repeater, for mounting the growth cabinet. See Figure 17, Figure 18, and
Figure 19.