
P
P
E
E
S
S
1
1
9
9
0
0
0
0
G
G
i
i
G
G
S
S
M
M
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
— Chapter 8. Powering the PES1900GI NR
PES1900NR Operations Manual
118
3. Slide the ½ -inch Lock Nut for the conduit, onto the strain relief. Tighten it until it is snug, but
still fits loosely. Refer to Figure 101.
Figure 101 Lock Nut Installation
4. Install the AC-IN power plug, onto the power cord, as shown in Figure 102.
Use the small screwdriver to terminate the Hot (black or brown) and Neutral or Common
(white or blue) stripped wires, on the AC line-cord plug.
Figure 102 AC-IN Power Plug for Primary Cabinet