
P
P
E
E
S
S
1
1
9
9
0
0
0
0
G
G
i
i
G
G
S
S
M
M
R
R
e
e
p
p
e
e
a
a
t
t
e
e
r
r
PES1900NR Operations Manual
Chapter 5. Installing the Growth Cabinet — 71
Figure 42 Cable/Conduit Assembly (Showing AC and DC Power Connectors)
Figure 43 Cable/Conduit Assembly
Installing the RF cable at the Main Repeater
1. Remove the eight (8) screws that hold the cover plate, on the left side of the main repeater
cabinet.