PES1900NR Operations Manual
Chapter 5. Installing the Growth Cabinet — 77
Figure 51 Connections for Vertical Mount
10.
Connect the RF cables, in place of the four RF terminators, removed in Step 3.
Connect the cable marked A into the connector marked A, the cable marked B into the
connector marked B, and so on…
Note that there are two types of RF connector arrangements, inline and staggered.
11. Loosely screw the Lock Nut to the Bell Housing box.
12. To secure the elbow to the Bell Housing, tighten the Lock Nut at the Bell Housing box. Use
the Lock Nut Wrench and tightening bar (supplied with the Growth Cabinet), as shown
13. To install the Bell Housing to the Primary Repeater cabinet, tighten the captive screws on the
Bell Housing.