PES1900Gi NR Operations Manual
Chapter 2. Installation Instructions — 29
Pre-Installation Site Review
Each site should be thoroughly reviewed before any equipment is mounted. Site review should
include, but not necessarily be limited to, the following factors:
Weather
Determine whether environmental conditions necessitate special shielding of the repeater or
other equipment.
Security
Determine whether some type of barrier is needed to protect equipment and if a security light is
required.
Aviation
Review tower heights and obstruction lighting requirements as specified by the national aviation
authority, e.g. US-FAA, US Federal Aviation Authority or Transport Canada. File NOTAMS as
required during construction.
Optional Site Equipment
Determine whether additional site equipment, such as a convenience power outlet, pump,
generator, or light is required, and, if so, where equipment is to be located and whether special
enclosures for any equipment is required.
Wiring and Wiring Access
Determine any special wiring requirements.
Cabinet Access
Determine whether there is enough room for the repeater door to open, once mounted.
CAUTION:
In an extremely hot and sunny environment, such as a desert, shading from direct
sunlight may be necessary to prevent the repeater and associated equipment from
overheating.