2 • Hardware installation
Model 2960/2996 RAS Getting Started Guide
24
Cable installation
2.
Rotate the power cable retainer clip so it secures the power cable plug in the IEC-320 connector as shown
in
figure 7
.
Figure 7. Power cable retainer clip
3.
Repeat steps 1 and 2 to install the remaining power cable.
Grounding the Model 2960/2996
Do the following:
1.
Assemble a ground wire using #10 AWG wire with green-colored insulation and two ring terminals. Make
the wire long enough to reach one of the following ground sources:
– The building ground rod (generally located at the site’s main service entrance)
– A sprinkler system pipe
– A cold-water pipe
– Building structural steel
2.
Install the ground wire between the grounding stud (see
figure 7
) and the grounding source.
To avoid the risk of personal injury, the distance between ground and the
equipment rack must not exceed the distance specified in either local electrical
codes or the National Electrical Code.
UNIT EQUIPPED WITH DUAL SUPPLIES
DISCONNECT BOTH SUPPLIES
BEFORE SERVICING
90-264V
(50-60 Hz)
2 AMP
10/100
ETHERNET
Power cable retainer clip
Grounding stud
Содержание NetLink 2960 RAS
Страница 6: ...Contents Model 2960 2996 RAS Getting Started Guide 6...
Страница 12: ...About this guide Model 2960 2996 RAS Getting Started Guide 12...
Страница 28: ...2 Hardware installation Model 2960 2996 RAS Getting Started Guide 28 Completing the hardware installation...
Страница 52: ...3 Configuring the RAS for operation Model 2960 2996 RAS Getting Started Guide 52 Completing the installation...