3 • Configuring the RAS for operation
Model 2960/2996 RAS Getting Started Guide
50
Completing the installation
To save the displayed data as a text file, select the
Save
option on your browser (see
figure 36
). For example,
under Netscape, select
File
>
Save As
. A dialog box will display enabling you to save the contents of the export
parameters to a text file. Select the location where you want the file stored, type a file name, and click
Save
.
Figure 36. Saving the access server flash memory configuration data as a text file
Completing the installation
This section verifies that the RAS is fully operational.
1.
Temporarily disconnect the male ends of both power cords from the power outlet. Wait 30 seconds, then
plug the power cords in again.
2.
Verify that the green
POWER
LED is lit. If the
POWER
LED is flashing green, refer to Chapter 5, “Trou-
bleshooting and maintenance”.
3.
Verify that the
Link 1 Frame
LED illuminates, indicating that the RAS is synchronizing with the T1/E1/
PRI signal.
4.
Verify that after 5 seconds, the
Link A Error
LED begins flashing, indicating that the RAS is satisfied with
the quality of the T1/E1/PRI signal.
5.
Verify that after 10 seconds, the
Link A Error
LED extinguishes, indicating that the RAS is satisfied with
the network signal and that the link is ready for use.
Содержание NetLink 2960 RAS
Страница 6: ...Contents Model 2960 2996 RAS Getting Started Guide 6...
Страница 12: ...About this guide Model 2960 2996 RAS Getting Started Guide 12...
Страница 28: ...2 Hardware installation Model 2960 2996 RAS Getting Started Guide 28 Completing the hardware installation...
Страница 52: ...3 Configuring the RAS for operation Model 2960 2996 RAS Getting Started Guide 52 Completing the installation...