48
Table 8 Battery number Configuration
CAUTION
● The following process must be performed if the UPS is
connected with generator.
● First, turn on the generator, after it runs stably connect
output power of the generator to UPS input terminal, then
turn on the UPS. After the UPS is turned on, please connect
load one by one.
● It is recommended that the generator capacity is as twice
as the UPS rated capacity.
● You had better not use the ECO mode when the quality of
the input AC mains is not good.
All UPS and EBP Cabinets
Number of Battery Strings
UPS only (internal batteries)
1 (default)
UPS+1EBP
3
UPS+2EBPs
5
UPS+3EBPs
7
UPS+4EBPs
9
NOTE
The UPS contains one battery string; each EBP contains two battery
strings.