25
1KVA Tower UPS and EBP(S)
2KVA/3KVA Tower UPS and EBP(S)
Figure17 Connecting the EBPS
UPS Initial Startup
To start up the UPS:
NOTE
Verify that the total equipment ratings do not exceed
the UPS capacity to prevent an overload alarm.
1.
If optional EBPs are installed, verify that the EBPs are connected
to the UPS.
Tower models.
See “Connecting the EBP(s)” on page 24.
2.
Plug the equipment to be protected into the UPS, but do not
turn on the protected equipment.
3.
Make any necessary provisions for cord retention and strain
relief.