22
(E) (F)
Figure 15 increase EBP plastic
base installation
2.
The installation between UPS and EBPS can be referred to Fig.16
Figure16 The installation for UPS and battery box
1. Install the base, then place the RT UPS on the base one by one as Fig.16
shows.
2. The cover installation and cable connection of the UPS and EBPS are the
same as RT. (To install the optional EBP(s) for a UPS)
Tower Installation
The tower cabinet comes fully assembled and ready to
connect.
CAUTION
The cabinet is heavy. Removing the cabinet from its carton
requires a minimum of two people.
To install the cabinet:
UPS
Plastic base